Station ยท solar
Chapel Lane Parley Solar Farm Phase 3
Chapel Lane Parley Solar Farm Phase 3 is a 4 MW solar photovoltaics power station, in South England, operated by Eco Sustainable Solutions.
- Capacity
- 4 MW
- nameplate
- Fuel
- Solar
- Solar Photovoltaics
- Solar rank
- #1050
- of 1,521 by capacity
- DNO region
- South England
Output
No live feed - Chapel Lane Parley Solar Farm Phase 3 is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?
Details
- Operator
- Eco Sustainable Solutions
- Technology
- Solar Photovoltaics
- Country
- England
- Coordinates
- 50.803, -1.864
- Data source
- DESNZ REPD
Fleet data as of 2026-08-15. See it in context on the station map.