Land at Carnegie Road
Land at Carnegie Road is a 20 MW battery site, in North Wales & Merseyside, operated by Ørsted.
- Capacity
- 20 MW
- nameplate
- Fuel
- Storage
- Battery
- Storage rank
- #97
- of 158 by capacity
- DNO region
- North Wales & Merseyside
Output
No live feed - Land at Carnegie Road is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?
Details
- Operator
- Ørsted
- Technology
- Battery
- Country
- England
- Coordinates
- 53.420, -2.928
- Data source
- DESNZ REPD
Fleet data as of 2026-08-15. See it in context on the station map.