Station ยท biomass
Metheringham Heath (Farm AD)
Metheringham Heath (Farm AD) is a 6.5 MW anaerobic digestion power station, in East Midlands, operated by Future Biogas (Blankney Estate).
- Capacity
- 6 MW
- nameplate
- Fuel
- Biomass
- Anaerobic Digestion
- Biomass rank
- #145
- of 584 by capacity
- DNO region
- East Midlands
Output
No live feed - Metheringham Heath (Farm AD) is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?
Details
- Operator
- Future Biogas (Blankney Estate)
- Technology
- Anaerobic Digestion
- Country
- England
- Coordinates
- 53.133, -0.472
- Data source
- DESNZ REPD
Fleet data as of 2026-08-15. See it in context on the station map.