Skip to main content

Station ยท storage

Native River

Native River is a 57 MW battery site, in North Wales & Merseyside, operated by Varco Energy.

Capacity
57 MW
nameplate
Fuel
Storage
Battery
Storage rank
#21
of 158 by capacity
DNO region
North Wales & Merseyside

Output

No live feed - Native River is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?

Details

Operator
Varco Energy
Technology
Battery
Country
England
Coordinates
53.265, -2.946
Data source
DESNZ REPD

Fleet data as of 2026-08-15. See it in context on the station map.