Skip to main content

Station ยท storage

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage is a battery site, in East England, operated by Low Carbon Limited.

Capacity
-
not recorded
Fuel
Storage
Battery
DNO region
East England

Output

No live feed - Periwinkle Hall - Links Solar photovoltaic farm & Battery storage is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?

Details

Operator
Low Carbon Limited
Technology
Battery
Country
England
Coordinates
51.865, 0.624
Data source
DESNZ REPD

Fleet data as of 2026-08-15. See it in context on the station map.