Skip to main content

Station ยท storage

Pillswood Phase 2

Pillswood Phase 2 is a 49.5 MW battery site, in Yorkshire, operated by Harmony Energy Storage.

Capacity
50 MW
nameplate
Fuel
Storage
Battery
Storage rank
#59
of 158 by capacity
DNO region
Yorkshire

Output

No live feed - Pillswood Phase 2 is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?

Details

Technology
Battery
Country
England
Coordinates
53.802, -0.417
Data source
DESNZ REPD

Fleet data as of 2026-08-15. See it in context on the station map.