Station ยท biomass
Seghill Village Waste Disposal Site phase 1 and 2
Seghill Village Waste Disposal Site phase 1 and 2 is a 4.1 MW landfill gas power station, in North East England, operated by Northumberland Waste Management / SITA UK.
- Capacity
- 4 MW
- nameplate
- Fuel
- Biomass
- Landfill Gas
- Biomass rank
- #189
- of 584 by capacity
- DNO region
- North East England
Output
No live feed - Seghill Village Waste Disposal Site phase 1 and 2 is distribution-connected (embedded), so the grid operator has no real-time metering of it; this page shows capacity only, honestly. Live output exists only for the 113 transmission-metered plants. What is embedded generation?
Details
- Operator
- Northumberland Waste Management / SITA UK
- Technology
- Landfill Gas
- Country
- England
- Coordinates
- 55.062, -1.535
- Data source
- DESNZ REPD
Fleet data as of 2026-08-15. See it in context on the station map.